|
|
|
Weapons equipment portfolios selection based on equipment system contribution rates
|
|
Peng LIU, Jichao LI, Boyuan XIA, Danling ZHAO, Yuejin TAN
|
|
| |
Table 2 Cost, capability type and capability level of the to-be-developed equipment
|
|
| Equipment | Capability type | Capability level (1 to 9) | Cost | | S1 | Reconnaissance | 3 | 30 | | S2 | 4 | 40 | | S3 | 5 | 50 | | S4 | 6 | 60 | | S5 | 7 | 70 | | S6 | 9 | 100 | | S7 | Decision-making | 3 | 30 | | S8 | 4 | 40 | | S9 | 5 | 50 | | S10 | 6 | 60 | | S11 | 7 | 70 | | S12 | 8 | 100 | | S13 | Strike | 3 | 28 | | S14 | 4 | 40 | | S15 | 5 | 50 | | S16 | 6 | 60 | | S17 | 7 | 70 | | S18 | 8 | 78 | | S19 | 8 | 80 | | S20 | 9 | 88 |
|
|
|