Reentrant flexible job-shop scheduling problem with assembly constraints in the context of wafer manufacturing: an improved MOEA/D with objective-oriented search
Xiuli Wu, Yaqi Zhang
Journal of Systems Engineering and Electronics . 2026, (5): 1665 -1690 .  DOI: 10.23919/JSEE.2026.000144