Journal of Systems Engineering and Electronics ›› 2011, Vol. 22 ›› Issue (3): 445-451.doi: 10.3969/j.issn.1004-4132.2011.03.012

• SYSTEMS ENGINEERING • Previous Articles     Next Articles

Improved unequal interval grey model and its applications

Yuhong Wang1,*, Yaoguo Dang2, and Xujin Pu1   

  1. 1. School of Business, Jiangnan University, Wuxi 214122, P. R. China;
    2. College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, P. R. China
  • Online:2011-06-22 Published:2010-01-03

Abstract:

A new method to improve prediction precision of GM(1,1) model with unequal time interval is presented. The grey derivative is multiplied by a parameter to guarantee the time response function satisfying approximately exponential function distribution. To simplify the process of parametric estimation, an approximate value is taken for the multiplied parameter. Then the estimators of coefficient of development and grey action quantity can be derived. At the same time, the principle of the new information priority is also considered. We take the last item of the first-order accumulated generation operator (1-AGO) on raw data sequence as the initial condition in the time response function. Then the new information can be taken full advantage of through the improved initial condition. Some properties of this new model are also discussed. The presented method is actually a combination of improvement of grey derivative and improvement of the initial condition. The results of an example indicate that the proposed method can improve prediction precision prominently.